A section of the sales floor has an extended ceiling installed.
Torches are used to heat PVC so it can be bent into shape.
The bay doors for the loading dock have been installed.
Workers continue to pour and smooth the concrete walkway surrounding the parking lot and the warehouse.
The area assigned to be the new showroom is underway