The concrete sidewalk around the parking lot is leveled and smoothed.
The framework for the drop ceiling above the executive offices is complete.
A welder makes a precision weld for a connection in the main restrooms.
The cement curbs surrounding the building are poured and smoothed.
The steel framework for the skylight above the sales area is in place.