Dan drills a hole that will be used for the cement base for the parking lot lights.
A worker stands beside the pipe that will connect the facility's drainage to the city's.
The studs are in place between the physical product location and the rest of the warehouse.
Cement walls around the main building are removed to make way for the new exterior.