With the concrete poured and set on the 1st wall, the crew preps to setup the forms for the 2nd wall.
This composite photograph shows the interior of the future Sweetwater sales complex before and after demolition.
The forms go up to pour the concrete walls for the 80' utility tunnel that connects the warehouse to the main building.
The footings for the East wall of the warehouse have been completed with rebar and concrete.