A trench is dug just before the stairs in the recording studio.
Workers set up the roof to the mall as rain droplets sprinkle down throughout the day.
Workers lifted several steel beams up into the air and placed them ontop of the mall between the corporate building and the new recording studio.
Fresh concrete is poured and poured over by workers.
The focus of construction work is placed on the studio and theatre area.