Steel beams are lifted up to the second floor above the restaurant.
New air ventilation components are delivered.
Concrete in the restaurant area has dried.
Concrete is poured this morning over the forthcoming restaurant floor.
Metal sheeting is shaved off in a fine line along the edge of the mall roof.