The white roof reflects much of the suns heat, keeping the building cooler in the warmer months.
Window shades are being installed throughout the building.
Workers remove the aluminum frames for the skylights in the warehouse and add plastic to prevent water leakage.
Phil removes plastic from new siding materials.
The east wall of the warehouse that will be connected to the main building via the mall is being prepared.