A list is made to replenish the food for the continental breakfast each morning.
The new Sweetwater building continues to develop under the fresh snow.
Siding is placed around the large generator on the south side of the warehouse to make for a more appealing view.
Protective coating on the warehouse is re-attached after high wind damage.
A worker smoothes the edges on window trim before it is installed.