The first glass panels are installed.
Final digging begins for the front entrance and reception area.
Concrete is poured into a platform frame on the second floor over the theater to eventually install large air conditioner units.
Massive air conditioners are delivered for installation above the studio.
Framework in the studio continues to go up.